Mineta San Jose International Airport Terminal Area Improvement Program

Slide background
Slide background
Slide background
Slide background

Summary

  • 12 days’ worth of pre-construction photography and video documentation
  • Constructed a web-based library to display the photographs that were taken during the preconstruction phase
  • Designed a unique photo grid to display GPS coordinates of each photo taken
  • Documented the construction phase with updates to video on a monthly basis
  • Installed six time-lapse cameras in different locations that documented construction in progress