Omnitrans San Bernardino Transit Oriented Development
The San Bernardino Association of Governments (SANBAG), Caltrans District 8, the City of San Bernardino, the City’s Economic Development Association and Omnitrans selected MBI to provide community outreach for one of the most significant public-private partnership projects in Southern Ca...
Golden Guardian Emergency Response Video
MBI was selected to play a key role in the latest state-wide disaster and emergency response exercise directed by the California Emergency Management Agency (Cal-EMA)...
Kaiser Permanente Los Angeles Medical Center
This $600 million facility is Kaiser’s largest hospital in the country. The 800,000 square foot medical center is a 400-bed facility staffed by 689 physicians and is expected to receive 750,000 patients per year. The new facility has operating rooms in excess of 600 square feet each, compared...
Proposition A/AA and Measure J Bond Program for the Los Angeles Community College District
Appointed as the Construction Documentation consultant for Proposition A/AA and Measure J Bond Programs for the Los Angeles Community College District’s $6 Billion project, MBI is responsible for the monthly documentation of all 9 campuses and 2 satellite campuses. Included campuses are East Los Angeles, Los Angeles...
Sound Energy Solutions
When Mitsubishi and ConocoPhillips established a joint venture called Sound Energy Solutions (SES), they selected MBI to create and brand the identity and logo for the new company, a potential provider of up to 20% of Southern California’s natural gas supply and an alternative to the region’s...
Clark County Regional Justice Center - Las Vegas, NV
MBI provided a detailed pre-condition survey for the new Las Vegas Regional Justice Center. Prior to construction, which we knew would impact residents nearby, MBI worked in partnership with URS. MBI went floor to floor throughout the building and photographically documented all areas...
SR-710 Conversations
The SR-710 Conversations were a series of 20 public meetings held by the Los Angeles Metropolitan Transportation Authority (METRO) from Mid-February to Early April (2011) regarding the regional traffic congestion problem in the San Gabriel Valley. The extensive project study area extends North to the 210 Freeway and South to the 10. It also extends West to the 5 Freeway and East to the 605.
State Route 91 Corridor Improvement Project
Riverside County Transportation Commission (RCTC) regards community outreach as an important, often critical facet of a successful project, and has chosen MBI to lead the communications effort. MBI is currently providing all of the community outreach strategies for this significant three-year...
Interstate 15 Corridor Improvement Project
The Riverside County Transportation Commission (RCTC) and California Department of Transportation (Caltrans) District 8 are working to improve traffic capacity and operations on Interstate 15 (I-15) from just north of the I-15/I-215 separation in the City of Murrieta, northward to State Route 60 (SR-60)...
Norman Y. Mineta San Jose International Airport Terminal Area Improvement Program
Selected as the construction documentation consultant for Mineta San Jose International Airport’s $1.5 billion Terminal Improvement Program, MBI provided a complete Pre-Condition Survey for the Gilbane Building Company, utilizing photographic and video documentation...
Riverside County Transportation Commission - Grade Separations Video
In their 2006 assessment of 58 crossings, the Riverside Country Transportation Commission identified eighteen mainline at-grade crossings as most critically in need of a grade separation to divide rail and vehicle traffic. This $560 million project provides for the construction of trenches or over-crossings...
Dana Point Harbor Revitalization Plan
When the Dana Point Harbor Department was established to provide oversight and direction in the revitalization of Dana Point Harbor, the team immediately recognized the need to consider the concerns and interests of numerous groups and individuals impacted by this harbor, which attracts...
Port of Los Angeles C-Street/Interstate 110 Access Ramp Improvements
This project will improve the flow of traffic from the I-110 Freeway ramp at C Street by consolidating two closely-spaced intersections and facilitating heavy right-turn volumes with free-flowing turn lanes. An additional benefit of this access ramp improvement project includes improved connectivity to the...
Port of Los Angeles - Clean Air Action Plan
The Clean Air Action Plan (CAPP) is a combined effort between the Port of Los Angeles, Port of Long Beach, US Environmental Protection Agency, California Air Resources Board and the South Coast Air Quality Management District...
Alameda Corridor East Construction Authority - Alameda Corridor Transportation Authority
The Alameda Corridor East encompasses a distance of 35 miles through the San Gabriel Valley between East Los Angeles and Pomona (generally paralleling the I-10 San Bernardino Freeway and SR-60 Freeway). This project serves an area of approximately 1.9 million residents and 30 municipalities...
I Live With Silence Now
MBI produced a special outreach video for Metrolink, originally aimed for junior high and high School students, dealing with the consequences of railroad trespassing. The video, “I Live With Silence Now”, won the American Public Transportation Association’s “Adwheel Award,” as well a...
Burbank Reservoir Number 1 Replacement
MBI has been selected to provide community outreach and precondition survey services for this important $98,000 project in the city of Burbank. Like any construction project located within a residential neighborhood, there are a number of challenges that have been and will continue to be faced...
All-American Canal Lining Project
In the construction of a new 23-mile long concrete canal, the All American Canal Lining Project is a historically significant undertaking and one of the largest water conservation projects in the United States. The new waterway, which runs parallel to the original 1930s canal, is a $235 Million...
City of Rialto
The City of Rialto is having issues with perchlorate in their water supply. Perchlorate levels are much higher than the acceptable government standards. Due to the sensitive nature of this situation, the City of Rialto brought in MBI to help educate...